Author: Linda Miller

Founded in Blackwattle Bay, SMC Marine are excited and proud to be the marine piling contractor working with Multiplex to deliver this iconic new fish market for Sydney. SMC Marine's owner, Pete Philipp and Project Manager Chris Hickey share their passion for this project. ...

To boost fish reproduction, and provide new location for fishing while easing pressure on natural reefs, NSW Department of Primary Industries went to tender for an innovative offshore artificial reef (OAR) installed 3.5km of Bateman’s Bay, north-east of Moruya Heads. Working in partnership with SEAO2, SMC...

Demolition, piling and construction of boardwalk and landscaped terrace: 135 x open-end steel tube piles installed within Sydney Harbour.63 x precast concrete headstocks installed on the piles.Spanning between the headstocks are approximately 300T of precast concrete beams and 80T of pre-fabricated aluminium modules.The aluminium modules were...

The Cairns Marine Precinct (CMP) at the Port of Cairns is an area of major economic importance to Far North Queensland industry. It accommodates a world-class marine services industry, the growth of which is key to the diversification of the region. The Project involves two...

SMC's role in this iconic project encompasses design finalisation, value engineering, supply and install of all steel building piles and promenade piles within Sydney Harbour for the partly submerged 100yr design life New Sydney Fish Market: 260 steel tube building piles spun and driven into rock...

SMC provided an innovative and durable prefabricated modular Aluminium solution to a conventionally-design bridge for Northern Beaches Council. The project involved development, engineering, design and construction of a 4m wide, 110-metre long, 50-year design life pedestrian and cycle bridge over the Narrabeen Lagoon. The new...

Completed by SMC Marine in November 2021, extreme weather and tides called for an innovative approach to design and construction of Broome’s new Town Beach Jetty. Construction was completed without marine support: SMC engineered a temporary works platform to support piling and deck construction using...