Uncategorised

Demolition, piling and construction of boardwalk and landscaped terrace: ~135 x open-end steel tube piles installed within Sydney Harbour. 63 x precast concrete headstocks installed on the piles. Spanning between the headstocks are approximately 300T of precast concrete beams and 80T of pre-fabricated aluminium modules. The aluminium modules are finished with a...