The Chiswick Ferry Wharf project involved the complete demolition of the old ferry wharf, replaced by an entirely new wharf structure.

The project was designed to a highly-finished standard requiring the following elements:

  • Highly-finished stainless balustrading
  • Robust blade wall glazing
  • Architectural pod cladding
  • Curved zinc roof structures
  • Stainless steel sleeves to piles
  • Architectural aluminium gangway with curved zinc roof
  • Signage complying with the Wayfinding Program
  • Electronic ticketing and hearing loop fitout and coordination

The project was delivered to a strict schedule, as the wharf was fully closed during construction. Procurement planning and offsite fit out of the pontoon and gangway structures was critical.