SMC Marine were engaged to restore the structural stability and capacity for 22kPA live load for a 10year design life. Design and remediation work of the existing wharf including the following elements:

  • Repair existing 58 Steel Jack Up Piles
  • Installation of 77 new Steel Jack Up Piles
  • Remediation of the timber substructure
    • New Timber Headstocks
    • Timber Headstock Supplement
    • PFC Capwale Supplements
    • PFC Girder Supplements
  • Installation of new Stainless-Steel Safety Ladders

Client: Port Authority of New South Wales