Demolition, piling and construction of boardwalk and landscaped terrace:

  • ~135 x open-end steel tube piles installed within Sydney Harbour.
  • 63 x precast concrete headstocks installed on the piles.
  • Spanning between the headstocks are approximately 300T of precast concrete beams and 80T of pre-fabricated aluminium modules.

The aluminium modules are finished with a recycled timber boardwalk and provision for future landscaping works.

A 100T floating steel pontoon and 10T steel gangway adjoins the end of the boardwalk.

Client: Lendlease Building