14 May One Sydney Harbour Public Domain / Wulugul Walk
Demolition, piling and construction of boardwalk and landscaped terrace:
- ~135 x open-end steel tube piles installed within Sydney Harbour.
- 63 x precast concrete headstocks installed on the piles.
- Spanning between the headstocks are approximately 300T of precast concrete beams and 80T of pre-fabricated aluminium modules.
The aluminium modules are finished with a recycled timber boardwalk and provision for future landscaping works.
A 100T floating steel pontoon and 10T steel gangway adjoins the end of the boardwalk.
Client: Lendlease Building