Projects

  • All
  • Boardwalk
  • Boat ramp
  • Bridge
  • Design and Construct
  • Heritage Wharves
  • Maintenance
  • Major Marine Infrastructure
  • Marinas and Pontoons
  • Marine Demolition
  • Travel Lift

Design and Construction of a 180-metre long boardwalk over the Narrabeen Lagoon including: Installation of Steel/HDPE pilesInstallation of structural hardwood timber Installation of FRP grating Installation of painted steel balustrade and stainless steel handrailConstruction of sandstone block abutments and concrete pathwayRemoval and rehabilitation of existing path, including...

Demolition, piling and construction of boardwalk and landscaped terrace: ~135 x open-end steel tube piles installed within Sydney Harbour. 63 x precast concrete headstocks installed on the piles. Spanning between the headstocks are approximately 300T of precast concrete beams and 80T of pre-fabricated aluminium modules. The aluminium modules are finished with a...

This 300T travel lift in Urangan Boat Harbour is the largest in regional Queensland. SMC completed design and construction of the travel lift, along with associated civil and dredging works. ...

The Chiswick Ferry Wharf project involved the complete demolition of the old ferry wharf, replaced by an entirely new wharf structure constructed to achieve a high standard of quality. ...

Client: QLD TMR / Projex Partners ( Client Project Manager ) Contract Duration: March 2017 - July 2017 Contract Value: $1.4m   Description of works:           The project involved the demolition and upgrade of two boat ramps in the Bowen region. Starboard Drive, the larger of the two boat ramps, is a four-lane...

Installation of a curved floating breakwater on telescopic piles. Client: Bellingham Marine Australia Date completed: 2007 Description of works: Installation of floating breakwater Details of any Innovations or extra value for money: SMC worked closely with Bellingham Marine to install and commission the first telescopic steel piles. The telescope steel piles have been...

Design and Construction of a new berth facility for cruise ships within Newcastle Ports. Client: Newcastle Ports Corporation Date completed: August 2010 Description of works: Refurbishment of two berthing dolphins including 45 pile replacements. Design and construction of a 60-5m precast conrete jetty. Details of any Innovations or extra value for money: All...

Supply and installation of 4 new tug berths in Port Kembla. Client: McConnell Dowell Constructors Date completed: December 2011 Description of works: Supply and installation of piles and associated structural steel for four new tug beths. Supply and installation of four tig impact barriers Details of any Innovations or extra value for...

Inspection and maintenance of Sydney RMS Ferry Wharves. Client: NSW Roads and Maritime Services Date completed: Currently under a 3 to 5 year contract Description of works: Works undertaken vary from minor works such as decking repairs, painting and touch up works to full wharf closures for piling and rebuildign of...