Author: Linda Miller

Design and Construction of a 70-metre long pedestrian Bridge over the Cooks river including: Installation of Steel/HDPE pilesInstallation of structural Aluminium headstocks and modulesInstallation of FRP grating Installation of Corten balustrade and stainless steel handrailInstallation of hidden handrail lightingRemoval of exiting sheet piles and subsequent installation of...

Design and Construction of a 180-metre long boardwalk over the Narrabeen Lagoon including: Installation of Steel/HDPE pilesInstallation of structural hardwood timber Installation of FRP grating Installation of painted steel balustrade and stainless steel handrailConstruction of sandstone block abutments and concrete pathwayRemoval and rehabilitation of existing path, including...

Demolition, piling and construction of boardwalk and landscaped terrace: ~135 x open-end steel tube piles installed within Sydney Harbour. 63 x precast concrete headstocks installed on the piles. Spanning between the headstocks are approximately 300T of precast concrete beams and 80T of pre-fabricated aluminium modules. The aluminium modules are finished with a...