Design and Construct

Design and Construction of a 180-metre long boardwalk over the Narrabeen Lagoon including: Installation of Steel/HDPE pilesInstallation of structural hardwood timber Installation of FRP grating Installation of painted steel balustrade and stainless steel handrailConstruction of sandstone block abutments and concrete pathwayRemoval and rehabilitation of existing path, including...

Demolition, piling and construction of boardwalk and landscaped terrace: ~135 x open-end steel tube piles installed within Sydney Harbour. 63 x precast concrete headstocks installed on the piles. Spanning between the headstocks are approximately 300T of precast concrete beams and 80T of pre-fabricated aluminium modules. The aluminium modules are finished with a...

Design and Construction of a new berth facility for cruise ships within Newcastle Ports. Client: Newcastle Ports Corporation Date completed: August 2010 Description of works: Refurbishment of two berthing dolphins including 45 pile replacements. Design and construction of a 60-5m precast conrete jetty. Details of any Innovations or extra value for money: All...