Overview
Design and construction of two extensions to Broome Wharf
Principal
Kimberley Ports Authority
01. Our Role
-
Supply and install steel driven piles
-
Supply and install steel deck framing
-
Supply and install precast concrete deck panels
-
-
-
-
02. Issues and Resolution
KPA had commissioned a design which proved to be particularly conservative, meaning that the project was not economically viable.
SMC approached KPA and offered to collaborate in design and development of an optimised construction methodology as well as alternative project concepts and costings. KPA engaged SMC for the study which ultimately led to KPA calling tenders based on the revised criteria.