Overview
SMC provided design and construction of a new boat maintenance facility and government marina in Coffs Harbour under a GC21 contract.
Principal
Transport for New South Wales
01. Role
The work was completed March 2022 and the construction scope included:
-
Dredging 350 cubic metres of marina sediment including sediment classification, dewatering and disposal
-
Pile installation for the travel lift, marina and holding pontoon
-
Travel lift beams of in-situ concrete and alumimium walkway / handrails
-
Installation of 9-berth marina using the Bellingham pontoon system
-
Installation of 2 gangways
-
Additional pontoon and gangway for boat maintenance facility
-
Hardstand construction rated for heavy loads
-
Installation of all the different associated services: electrical, water, fire, stormwater and a trade waste system