Demolition, piling and construction of boardwalk and landscaped terrace.
Principal
Lendlease & Crown Resorts
01. Role
-
135 x open-end steel tube piles installed within Sydney Harbour.
-
63 x precast concrete headstocks installed on the piles.
-
Spanning between the headstocks are approximately 300T of precast concrete beams and 80T of pre-fabricated aluminium modules.
-
The aluminium modules were finished with a recycled timber boardwalk and provision for future landscaping works.
-
A 100T floating steel pontoon & 10T steel gangway adjoins the boardwalk.