Overview
The team at SMC Marine designed and constructed a new berthing facility at Pier 26.
Principal
Sydney Harbour Foreshore Authority
01. Project Details
The facility comprises of 12 berths for vessels up to 200T displacement and a ferry wharf. The project was delivered within a 16-week site window including the demolition of the existing structure.
02. Role
-
Structural design of the new structure included the use of aluminium for the jetty substructure, a first for a facility of this type
-
Coordination of architectural design. An architect was engaged at SMC’s request due to the high profile of the site
-
Demolition of the existing facility including recycling of all structural timber
-
Modular construction of the new jetty including 34m piles installed in single lengths